Brand: Bella Vista
Range: Mica
WBS-51-BLK-TK
FREE SHIPPING AUSTRALIA-WIDE ON ORDERS $100+
Confidence for Life
Every piece is backed by:
• Lifetime Colour Warranty – keeps its finish for life.
• Lifetime Parts or Replacement – we’ll repair or replace, no questions asked.
Explore the Bella Vista range – designed with a refined, minimalist aesthetic and built for everyday practicality. Each product is crafted with rigour by Australian engineers in Melbourne and manufactured for lifetime use. This close attention to every stage of the design and production process means Bella Vista products offer superior quality and a longer life – and that’s backed by their warranty guarantee.
Upgrade your bathroom, kitchen, or laundry with products that feel considered, consistent, and built to last.
We ship with two of Australia’s most reliable carriers: Australia Post and Direct Freight Express.
Estimated delivery times
We generally dispatch within 2 working days. Delivery times depend on your location and the carrier selected.
Melbourne customers can collect their order directly from our showroom. Please contact us after placing your order so we can arrange this for you.
Yes, Melbourne customers can collect their order directly from our showroom. Please contact us after placing your order so we can arrange this for you.
Yes. Most of our products come with a 10-year warranty, and many ranges are backed by a lifetime warranty. The exact coverage depends on the product type and range. You can find full warranty details on each product page or by contacting our team.
Yes. Online Store credit can be issued for eligible returns and is valid for six months.






