Bathroom
Kitchen & Laundry
Mirrors

Mica Wall-Spout Combo - Straight Spout - 1P - TRIM KIT ONLY

Brand: Bella Vista

Range: Mica

WBS-51-CP-TK

Colour
Chrome
Black

FREE SHIPPING AUSTRALIA-WIDE ON ORDERS $100+

Lifetime Warranty

Confidence for Life

Every piece is backed by:
Lifetime Colour Warranty – keeps its finish for life.
Lifetime Parts or Replacement – we’ll repair or replace, no questions asked.

Download Warranty Information

Enhance your space with the Mica Wall-Spout Combo - Straight Spout - 1P - TRIM KIT ONLY, sleek and practical. Minimalist and functional, the Mica Wall-Spout Combo - Straight Spout - 1P - TRIM KIT ONLY is designed to complement any basin or bath setup with a streamlined water flow. 

  • Requires Mixer Body
  • Lead Free
  • 185mm Spout Supplied As Default
  • CLICK HERE For Other Spout Lengths
  • WELS Rating: 4 star / 6.5 L/min
  • WELS Registration Number: T41401

Explore the Bella Vista range – designed with a refined, minimalist aesthetic and built for everyday practicality. Each product is crafted with rigour by Australian engineers in Melbourne and manufactured for lifetime use. This close attention to every stage of the design and production process means Bella Vista products offer superior quality and a longer life – and that’s backed by their warranty guarantee.

  • Solid brass construction with superior PVD finishes
  • Lead-free and WaterMark / WELS compliant where applicable
  • Durable finishes that are easy to clean and resistant to routine wear
  • Smooth, reliable operation day after day
  • Lifetime warranty on colour and parts or replacement product
  • Supported by Bella Vista’s local after-sales service

Upgrade your bathroom, kitchen, or laundry with products that feel considered, consistent, and built to last.

We ship with two of Australia’s most reliable carriers: Australia Post and Direct Freight Express.

  • Orders under 5 kg are sent via Australia Post
  • Orders 5 kg and above are shipped with Direct Freight Express

Estimated delivery times

  • Metro areas: 2–7 business days
  • Regional & remote: 5–14 business days

We generally dispatch within 2 working days. Delivery times depend on your location and the carrier selected.

Pickup Option (Melbourne Customers)

Melbourne customers can collect their order directly from our showroom. Please contact us after placing your order so we can arrange this for you.

  • Proudly Aussie owned and operated
  • 30-day return policy
  • Free shipping in Metro Melbourne
  • Fast, reliable delivery Australia-wide
  • 20+ Years’ Industry Experience

FREE SHIPPING AUSTRALIA-WIDE

FREE SHIPPING AUSTRALIA-WIDE

FAQ

Yes, Melbourne customers can collect their order directly from our showroom. Please contact us after placing your order so we can arrange this for you.

  • Metro areas: 2–7 business days
  • Regional & remote: 5–14 business days We generally dispatch within 2 working days. Delivery time depends on your location and the carrier selected.

Yes. Most of our products come with a 10-year warranty, and many ranges are backed by a lifetime warranty. The exact coverage depends on the product type and range. You can find full warranty details on each product page or by contacting our team.

  • Change of mind: Returns accepted within 30 days, provided items are unused, uninstalled, and in original packaging.
    Return shipping costs are the customer’s responsibility. Refunds are processed back to the original payment method within 3–5 business days.
  • Faulty items: If your order is faulty, we’ll cover the cost of return freight.

Yes. Online Store credit can be issued for eligible returns and is valid for six months.